LM/TM2500 models can be updated to the current LM2500+ or LM2500+G4 configuration for enhanced output and improved thermal efficiency. The upgrade can be performed through the following options:

 

  • Convert existing engine with a modification kit so that it exhibits the same performance as the production +/+G4 model
  • Replace the existing engine with a production LM2500 +/+G4
  • Output

What Can Upgrading Do for You?

  • Up to 33.4MW gas turbine output at ISO conditions.
  • Up to 12% simple cycle heat rate improvement, or +2.1 points of efficiency improvement with the LM2500+G4 engine.
  • New single crystal hot-section materials and cooling technology to maximize life at the new higher firing temperatures.
  • Use with either SAC or DLE combustion systems.

How we get you there

  • Replace the existing engine with a production LM2500 +/+G4.
  • Modify the existing package with a kit that allows for the slightly longer LM2500+/+G4 engine, higher airflow, and higher fuel flow requirements of the replacement engine.
  • New control system installed into existing cabinetry with a new HMI computer to maximize re-use of existing material and reduce downtime.

Applicable Turbine Models

  • LM/TM2500

To see pricing informationrequest a quote.

lm2500-base-to-plus-plus-g4

NEXT STEPS

icon-upgrades-tool

Upgrade Tools

Sign in to view saved upgrades or request a formal quote from your GE Account Manager.

View Saved Upgrades >

test-icon-3

Asset Evaluator

Identify opportunities to improve your GE gas turbine's performance with our Asset Evaluator.  ASSET EVALUATOR