Primary Injection Testing

Verify Proper Operation

For primary injection testing, high current is injected on the primary side of the current transformer. The entire chain—current transformer, conductors, connection points, relay protection and sometimes circuit breakers as well—is covered by the test. The system being tested must be taken out of service during primary injection testing, usually conducted in connection with commissioning.

Primary Injection Testing

Download our product brochures for complete technical specifications, accessories and application examples.

ODEN AT™ Primary Current Injection Test System

For primary injection testing of protective relay equipment and circuit breakers.

English (694KB PDF) | Français (706KB PDF)
Deutsch (880KB PDF) | Español (704KB PDF)
Svenska (697KB PDF)

ODEN A™ Primary Current Injection Test System

For primary injection testing of protective relay equipment and circuit breakers.

English (443KB PDF) | Français (450KB PDF)
Deutsch (628KB PDF) | Español (449KB PDF)
Svenska (443KB PDF)

CSU600A™ / 600AT™ Current Supply Units

For conducting primary tests on protective relays and current tests on low-voltage circuit breakers and overcurrent devices.

English (594KB PDF) | Français (603KB PDF)
Deutsch (780KB PDF) | Español (602KB PDF)
Svenska (594KB PDF)

TM200™ Timer

For use with CSU600A current supply unit or ODEN A primary current injection test system.

English (340KB PDF) | Français (348KB PDF)
Deutsch (525KB PDF) | Español (347KB PDF)
Svenska (341KB PDF)

Ordering Information